Future-proof Your Build.
Eliminate Service
Upgrade Risk.
FUTURi helps developers and builders deliver electrified, densified homes — from multiplex to communities — without unpredictable service upgrade costs, utility delays, or bulky transformer requirements.
The Builder Challenge
Electrification Costs Are Not Only Equipment
They Are Time and Risk.
Informal or unproven load solutions
aren't rapidly deliverable or reliably operationalized with confidence.
Service upgrades
can add major cost exposure and create schedule uncertainty.
Utility coordination
can introduce long lead times and late stage design changes.
Pad mounted equipment
can reduce usable site space and add installation complexity.
What FUTURI MULTIPLEX Delivers
Service upgrade avoidance
Eliminate unpredictable delays and costly utility upgrades that can derail timelines and reduce project margins.
Designed for builders
Reliable, CSA-approved technology that integrates seamlessly into existing workflows with minimal disruption.
Longevity and reliability
Utility-grade equipment designed to withstand decades of operation, protecting your units and reputation.




Your Gains
01 / 04
Schedule certainty
Maintain schedules and reduce risk to occupancy
Your Gains
02 / 04
Modern energy experience
Offer a modern, controllable home energy experience with monitoring
Your Gains
03 / 04
Premium positioning
Market units as future-ready for EV, heat pumps, solar
Your Gains
04 / 04
Futureproofed homes
Futureproof the home for additional EVs and future demand response tariffs
Typical Use Cases
Multiplex and densified residential projects, gardens, basement suites

Electrification Services
Built Around Your Project.
We help builders and utilities plan, deploy, and operate electrification with practical implementation support from design through commissioning.